Zero liquid discharge (ZLD) plants. Designed for your effluent, within CPCB / SPCB norms. Quote in 24 hours.

Green hopper-bottom ETP tank with spiral staircase
30+Years in ETP / STP engineering
Pan-IndiaProjects across India
24 hQuote turnaround

Why ZLD, and why now Discharge is no longer an option for many plants.

Pollution control boards are requiring more industries and locations to stop discharging effluent altogether. A ZLD plant recovers most of your wastewater for reuse and turns what remains into solid salt — no liquid leaves the factory.

Done well, ZLD also cuts your fresh-water intake. Done badly, it becomes the most expensive utility on site. The difference is in the design.


We build ZLD plants End to end, for your effluent.

  • Complete ZLD plants designed for your flow and effluent
  • One engineering team accountable for the whole system
  • Installation and commissioning supervised by our engineers
  • Board queries answered by us: any pollution control board question about our design or equipment

Already have an ETP? Upgrade it instead of starting over.

Most of our ZLD work starts with an existing plant. We audit what you have and build on it. You keep your existing investment and get to zero discharge faster.

Book a free ETP-to-ZLD assessment


Industries we design ZLD for

Textile & dyeingPharmaceuticalChemicalElectroplatingFood & dairyPaper & pulp

From study to zero discharge Six steps.

  1. Free consultation30-minute call on your effluent, flow and discharge requirements.
  2. Site audit & samplingWe assess the existing plant and analyse your effluent.
  3. ZLD design & DPRWater balance, process design, layout and costing.
  4. Vendor finalisationSpecifications issued, quotes compared, suppliers selected.
  5. Installation supervisionOur engineers oversee construction and erection.
  6. Commissioning & handoverStart-up, performance trials and handover, guaranteed to perform.

Questions

How much does a ZLD plant cost?

Cost depends mainly on your effluent flow and characteristics. We give a budgetary figure after a call and a firm quote after a site visit and effluent analysis.

Can my existing ETP be converted to ZLD?

Usually, yes. We audit your current plant and build on what already works instead of starting over.

Get your ZLD plan. Share your flow and effluent type — an engineer replies within 24 hours.

An engineer replies within 24 hours, Mon–Sat, 9 AM – 6 PM.